baseline-script · scenario v2 · with memory · Oct 26, 03:45 PM · 10.6s
Trajectory · 3 steps
- 0agent
ask_arkher{ "message": "Which of Kestrel Power's PPM deals are actually under signed contract today?" } - 1tool
ask_arkherNone of them. As of the Q3 2026 board meeting on 5 Oct 2026, none of the four PPM (Power Production Management) contracts, 475 MWdc in total, is signed. [3] - Northfield Solar (150 MWdc): pending final signature [3] - Grayson Ridge (120 MWdc): pending final signature [3] - Alder Flats (110 MWdc): verbally awarded [3] - Copper Basin (95 MWdc): verbally awarded [3] The March 2026 company overview, prepared for early investor conversations, said "We have signed four PPM contracts covering 475 MWdc." [14] The newer board deck supersedes it and lists the same four contracts as unsigned. The team size also changed. The March overview said 12 technicians [14]. The board deck says the current field team is 4, with a plan for 10 if all four contracts close [4].
{ "http": 200, "cited": [ "Kestrel Power - Q3 2026 Board Deck 2026-10-05.md", "Kestrel Power - Company Overview 2026-03-10.md" ], "answered_by": "Anthropic/claude-sonnet-5-5", "trace_id": "bf01d0e3-e9b9-40f2-8c88-34142a871fab", "seconds": 11 } - 2agent
Verdict: Baseline run: messages sent as written, no judgement by the tester.